Crematorium 

Crownhill Crematorium 

Main Contractor: 
Kier Marriot 
A challenging project incorporating a combination of cycloid-shaped in-situ concrete roofs and joining flat roofs: the columns along the lines of the external walls have fully insulated cavities and support both the cold external concrete roof structure and the warm internal roof structure. 
 
Exposed concrete finish throughout, both in the external and the internal spaces. Self-levelling and self-smoothing screed was used: hard-wearing, scratch-and-slip-resistant floors, power-floated and polished after pouring. 